Luxa Riparo Pura Carport — Installation guide
Free-standing aluminium carport with slatted aluminium roof and integrated drainage. 10 assembly steps from foot plates to corner sealing. ~3 hours, 2-person team.
Total install time
Approx. 3 hours · 2 installers
This guide is the canonical installation reference produced from the same parametric model that drives our CAD. Drawings, dimensions and torque values are nominal and subject to project tolerance.
HOW IT'S BUILT
ASSEMBLY · 10 STEPS
Step-by-step installation
STEP D1 · 01/10
Place the foot plates
First action on the slab — sets the entire system geometry.
Sub-steps
- 1Mark the four corner positions according to the site survey.
- 2Verify W x P footprint and check both diagonals.
- 3Place the ground connections with feeds facing inside.
- 4Drill and fix the plates to the floor.
- 5Check that all plates are level.
- 6Confirm the layout before column assembly.
Specifications
Keep the feed/open side facing the system interior.
- Wrong orientation will affect water outlet alignment.
TOOLS
Tape measure, chalk line, hammer drill, torque wrench, spirit level
TIME
30-45 min