Back to ponarc.com
FRAME · STEP D5 · 05 OF 18
05

Install front carrier gutter

Install the front PN-GU-500 carrier gutter — match heights within 2 mm.

Install front carrier gutter — illustration
Fig. 05 — Install front carrier gutter

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      18 min

      About step 5 of the Luxa Sereno 500M installation

      Install front carrier gutter · FRAME · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)

      Install the front PN-GU-500 carrier gutter — match heights within 2 mm.

      Nearby steps in this installation