Back to ponarc.com
FINISH · STEP D24 · 24 OF 26
24

Route motor cables

Route the motor cables down through the designated pillar channel.

Route motor cables — illustration
Fig. 24 — Route motor cables

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      15 min

      About step 24 of the Luxa Aperio 500 installation

      Route motor cables · FINISH · 26 step · Luxa Aperio 500 (free-standing motorised pergola)

      Route the motor cables down through the designated pillar channel.

      Nearby steps in this installation